Concrete Wall Construction

Stericycle / Waste Management

Stericycle, a WM company

View 9 PhotosSurface Prep & Compaction

A closer look at JAM’s concrete wall work at a Stericycle facility—from forming and reinforcement to the pour. These field photos and videos document the work in progress. Additional photos show aggregate preparation and compaction alongside the yellow-painted wall.

  • Concrete walls
  • Timber formwork
  • Reinforcing steel
  • Concrete placement

14 photos · 2 videos

Timber wall formwork along the site with a Stericycle trailer in the background
Crew working the aggregate surface beside a yellow-painted concrete wall with a Stericycle trailer behind

Photo folder · 9 photos

Surface Prep & Compaction

View Photos

Forming to pour

  1. 01Formwork overview — wall forms set along the site.

  2. 02Reinforcing steel placed inside the wall forms.

  3. 03Pour in progress within the formed wall.

  4. 04Fresh concrete placement between the forms.

  5. 05Concrete and reinforcing detail.

Field videos

Concrete Wall Pour — Field Video
Concrete Placement — Additional Field View